 |
How the Sainsbury Centre will benefit
* The entrance to the Main Gallery will have a canopy and new doors will be installed, improving access to the building. A visitor car park will also be created.
* Where the visitor enters the main building, there will be a wide 'bridge', over an atrium that extends down to basement level. Light wells, a lift and a spiral staircase will lead down to the new basement lobby and corridor.
* The spiral staircase will be extended to connect the current internal high level bridge, the ground floor and the basement corridor.
* New 'state of the art loos', cloak room and locker facilities will be accessible from the reception area.
* As the visitor walks past the light wells on the ground floor, they will find a new reception desk, new Gallery Shop units, and the entrances into the Permanent Collection and the Special Exhibition galleries. The shop space will be extended in the atrium at basement level, please see below.
* Continuing past the ground floor Gallery Shop, the Gallery Café will be refurbished, replacing the Café furniture and refitting the kitchen.
* At the bottom of the atrium a second reception area and extended Gallery Shop will be created. In this space, the visitor will be able to look along a wide corridor, flooded by daylight both from above and from the far end where it links with the Crescent Wing reception area.
* A wall of glass along the corridor will screen the new education space with workshop and IT facilities.
* Bays along the corridor will provide extra display space.
* All the flooring, lighting and the heating system in the main building will be renewed.
* Signage will be reviewed, both inside and outside the Gallery.
Return to main story page»
|